Close
MYMSN
MySkype
E-mail

Click amplification +
 
200m3 biogas plant
This 200m3 biogas plant is built to process dung and other organic waste produced from a pig farm raising 1,000 pigs. In this way, not only is the pollution problem caused by the dung solved and the t…
Detailed Productd Description
This 200m3 biogas plant is built to process dung and other organic waste produced from a pig farm raising 1,000 pigs. In this way, not only is the pollution problem caused by the dung solved and the treated water up to the discharge standards, but the entire pig farm’s energy consumption is sufficed by the biogas produced, even it is cold and the pigsty needs to be warmed. The pig farm owner can save about 14,500.00$ that used to spend on gas and electricity, except for the indirect benefit from the improved environment.


[ Go Back ]
Company Address:Room 2302, 23/F, Seaview Commercial Building,21-24 Connaught Road West, Sheung Wan, HK
Tel: 852-28167037-1133 Fax: 852-28558158
Copyright © Huamei International Green Energy Holding Co., Limited All Right Reserved.